Comprehensive Tank Refurbishment

Engen TK 1444, East London

PetroENG delivered full-scope refurbishment and API compliance upgrade for Tank 1444, including structural, mechanical, piping, and safety enhancements over a 217-day execution period.

The Challenge

Refurbish Tank 1444 to API 653/650 compliance while addressing extensive corrosion, safety risks, and outdated systems.

The Solution

PetroENG delivered tank, piping, structural and electrical refurbishment to API standards:

  • Full API 653/650 repairs
  • Tank and roof refurbishment with nozzle, manway, and vent upgrades
  • New fire suppression system
  • Walkway and access structure repairs and fabrication
  • Corrosion protection with C5-grade coatings

Project Snapshot

  • Duration: 217 days on-site
  • Integrated tank, piping, structural and electrical scope
  • API 653/650 certified inspection and handover

Results & Impact

  • Restored Tank 1444 to full API 653/650 compliance
  • Improved operational safety with upgraded fire suppression and access systems
  • Extended tank service life through corrosion protection and structural upgrades
  • Enhanced environmental safeguards via compliant repairs
  • Delivered full QC documentation and corrosion guarantee for assurance

Timeline

217 days

Technologies

API 653/650 testing (PMI, X-Ray, UT, PT, MPI, Vacuum Box), Dow Corning 888 sealant, C5 coating system, new fire suppression and piping systems